Today on Quantum Vibe: Building a home Strip 2495 - Click strip above to goto the next strip.
First Seen: Mon 2024-09-09
Story & Art: Scott Bieser - Sci-Fi Adventure Monday & Thursday.
Dark plans fall like thunderbolts.
Quantum Vibe
A thousand years in the future, humanity has colonized worlds in nearly
100 galaxies, thanks to Quantum Vibremonic technologies developed five
centuries earlier. Other new technologies have created various
off-shoots of humanity and extended life expectancies five-fold. The
story begins with how a mad scientist and his plucky assistant, along
with their robot friend, brought humanity to the stars, and continues
with the adventures of some unique people in fantastic places.
Indiegogo Campaign Has Begun! [ Nov 10, 2024 ]
Second times a charm. The epic QUANTUM VIBE: This Means War story concludes with Part 3, and we require funds to publish a print volume. To sweeten the pot a bit, a 3 pack of the print and PDF copies of all three parts of the This Means War story is a new perk. The stickers and magnet add-ons for the Project for a Free Cosmos concept (explained in the story) are available. And one final incentive for the first 20 who get there first, an add-on for a Free Cosmos Project coaster (1 per perk).
The campaign starts today, Sunday, November 10th, and will conclude in 31 days.
Click on this link or on the picture to back our campaign!
FIRST PART
Upper Left part of parcel. Li and Nicole are setting the plasteel sections which will form the circular pier-and-beam foundation for the house.
Alyss continues narration: The next few days we focused on getting the house together.
Alyss: First we laid in the plumbing lines, and assembled the foundation.
Second PART
Upper Right part of parcel. Li and Nicole are setting the floor plates onto the foundation, gluing them together with glue guns. The kids hold the plates ready for their parents.
Alyss: Then we installed the floor-plates, glueing them into place.
Alyss: Atop the floor we installed the critical framework for the upper section.
THIRD PART
Lower Left part of parcel. Li is installing the kitchen plumbing.
Alyss: Li insisted on installing all the plumbing himself.
Alyss: He said it was relaxing work, but you wouldn’t know from all his cussing.
Alyss: The kids and I stayed in the cruiser, doing some math lessons.
FOURTH PART
Lower Right part of parcel. Everyone is on the upper floor. Li and Nicole are installing bedroom walls in that section.
Alyss: By the end of the fourth day we had the walls up. The next day we would pull the furniture in from the cargo container.
Panel 5
Med close-up of Nicole and Li sleeping in the tent.
Alyss: We went to sleep that night tired but looking to finishing the house the next day.
Panel 6
Suddenly they are awake. There’s a couple centimeters of water under them
Nicole: que porra é essa!